Louisiana DOTD has announced that road construction will begin October 21, 2026 with an estimated end date of January 31 2027 and extend from the Tangipahoa Parish Line on Hwy. 38 east to Hwy 438 in Mt. Hermon.
There will be alternating and intermittent lane closures involving both the left and right lanes. One lane will be open at all times but motorists may encounter slight delays during this time. Emergency vehicles will have access. **Over-size loads are not permitted at this time.**
The work will be to remove and replace pipe across the highway, remove and replace the existing asphalt roadway, place temporary and/or permanent striping, rumble strips, and related work.
DOTD appreciates your patience and reminds you to please drive with caution through the work zone and be on the lookout for work crews and their equipment.
No comments:
Post a Comment